Steel production in Baft with Khwarizmi catalysts

  1. Home
  2. \
  3. News
  4. \
  5. \
  6. Steel production in Baft with Khwarizmi catalysts

With signing a new contract for production and delivery of reforming catalysts for the DRI unit, the cooperation of Khwarizmi Technology Development and Baft Steel Complex entered a new stage.

 

According to Khwarizmi Public Relations, the collaboration of Khwarizmi Technology Development Co. and the huge production complex of Baft Steel, after the successful production and delivery of reforming catalysts for the Baft Steel Factory No. 2 and loading of the catalysts in the newly built Baft No. 2 factory (AUG 2023), entered a new stage with signing a new contract for production of DRI catalysts required by Baft Steel Factory No. 1.

 

In this contract, Khwarizmi has committed to produce and deliver the catalysts required by the DRI unit of Baft Steel Factory No. 1, including active reforming catalyst, semi-active reforming catalyst, and inert catalyst, with the highest quality in the schedule set by Baft Steel Complex.

Steel production in Baft with Khwarizmi catalysts

News

share:

Related Posts