Pasargad Steel Complex

About Pasargad Steel Complex

Pasargad Steel Complex (P.J.S.)Pasargad Steel Complex a privately held (PJS) company, was established in south east of Shiraz city; Fars province as a fully-furnished integrated steelmaking complex, incorporating all relevant stages of steel making value added chain from collecting iron ore run-of-mine to producing various types of alloy steel in compliance with the international standards, in a surface area extended in three million square meters. Achievement of our goals, is possible by continuous innovation, optimum allocation of the resources, environmentally adaptable and friendly methods for steel production, application of best ethical practices and standards in the industry, recruitment of the most capable workforce and continuously investing on our human capital resources in various aspects, and maximizing return on the investment.

The factory design concept from the very first, was to receive iron ore from local mines nationwide and further processing of run-of-mine by crushing, iron ore concentration, converting iron ore concentrate to pellet, reducing pellet to sponge iron (DRI), melting DRI through EAF, and converting molten steel to various types of alloy steel through secondary metallurgy (Ladle Furnace and Vacuum Degassing process).

Our melt shop including electric arc furnace (EAF), ladle furnace (LF) and continuous casting machine (CCM), capable of close casting, have been commissioned and are in operation since 2013 and our vacuum degassing plant (VD/VOD) commissioned in 2019; currently, by operating such advanced and up-to-date equipment and qualified operators, we are able to produce different steel grades in form of billets and blooms in various sizes In order to produce downstream steel products, including various steel sections for a wide range of industrial applications.

Contacts

Pasargad Steel Complex, Km 68 Shiraz- Jahrom Road, Fars Province.

List of contracts concluded with Pasargad Steel Complex

Row subject amount Agreement date
1   DRI Catalyst 3000 Kg 2021-10-10
2 Sulfurized adsorbent 5000 Kg 2021-05-30
3   DRI Catalyst 280,000 Kg 2018-10-09